Tuesday, March 10, 2015

4 More Frames Installed

On March 8th Fritz's son, Fritz, Derick, and I installed 4 more boiled frames on the portside of the boat. That only leaves the aft-most two frames to replaced. So far we haven't kerfed any frames on the portside since our boiling system has been refined, though the shape of the hull at the stern is too sharp a curve to get without kerfing. We hope to install those frames in the next two weeks, then move onto replacing the sheer clamps. 

1 comment:

  1. Hi Mike, it's Simon of the Miss Bailey. I'm having a launch ceremony this Sunday the 19th at 2pm at Boulevard Park for my new sailing outrigger kayak trimaran, the Little Mouse. Stop by if you want to see it in action!

    ReplyDelete